云南辗镭装饰设计工程有限公司

Product search
Dual-mode TBM

Dual-mode TBM is mainly applied to big geology difference, long distance construction of tunneling project. Dual-mode TBM in the construction can according to hydrogeological condition change mode, to achieve that improve the rate of construction and reduce the cost of construction. Dual mode TBM has two type deslag mode or two type pressure balance mode’s full fracture surface TBM. Currently, have earth pressure, slurry Dual-mode TBM and earth pressure, rock Dual-mode TBM.

Dual-mode TBM which is produced by our company is a kind of derived equipment between balance TBM and shield rock TBM, have two different type TBM’s technical feature at the same time. When construction section geology appear large change, TBM handover suitable working mode, can make sure the safety and rate of construction, and can make sure the efficiency of whole construction. Currently, our company has produced more than 10 sets of such type TBM, mainly exported to Middle East.

TEL:+86 24 67859165;+86 24 67859170.E-mail:nhi-international@nhi.com.cn

 

肃南| 格尔木市| 天津市| 轮台县| 财经| 诸暨市| 朝阳县| 云和县| 清苑县| 岗巴县| 运城市| 尉犁县| 四平市| 北流市| 星子县| 甘洛县| 两当县| 武平县| 日喀则市| 赤峰市| 闻喜县| 黔江区| 炎陵县| 会昌县| 永吉县| 康保县| 肥乡县| 克山县| 治多县| 子洲县| 宝兴县| 绥江县| 大足县| 赤壁市| 江源县| 报价| 香港 | 镇宁| 江陵县| 西宁市| 尖扎县|