云南辗镭装饰设计工程有限公司

Dual-mode TBM

Dual-mode TBM is mainly applied to big geology difference, long distance construction of tunneling project. Dual-mode TBM in the construction can according to hydrogeological condition change mode, to achieve that improve the rate of construction and reduce the cost of construction. Dual mode TBM has two type deslag mode or two type pressure balance mode’s full fracture surface TBM. Currently, have earth pressure, slurry Dual-mode TBM and earth pressure, rock Dual-mode TBM.

Dual-mode TBM which is produced by our company is a kind of derived equipment between balance TBM and shield rock TBM, have two different type TBM’s technical feature at the same time. When construction section geology appear large change, TBM handover suitable working mode, can make sure the safety and rate of construction, and can make sure the efficiency of whole construction. Currently, our company has produced more than 10 sets of such type TBM, mainly exported to Middle East.

TEL:+86 24 67859165;+86 24 67859170.E-mail:nhi-international@nhi.com.cn

 

连山| 玉林市| 绥芬河市| 长宁县| 巍山| 西吉县| 墨竹工卡县| 卢氏县| 招远市| 都昌县| 兴和县| 稷山县| 巴东县| 石台县| 贵南县| 大洼县| 舞钢市| 攀枝花市| 溧水县| 屏山县| 眉山市| 嘉义县| 乐东| 彰化县| 清涧县| 澜沧| 泸西县| 扎兰屯市| 清水河县| 万年县| 京山县| 晋州市| 澎湖县| 永宁县| 万山特区| 邹平县| 汪清县| 从化市| 香格里拉县| 建昌县| 绩溪县|