云南辗镭装饰设计工程有限公司

NHI Headlines

NHI’s TBM creates a successful open for the extension line between Beijing and Tianjin

Published:2015-04-07

Recently, that the Φ11.97m slurry balance TBM calledNO. 45 of SHMG emerged through 18 months work. It marks the successful open for the extension line between Beijing and Tianjin, which is the national key construction project in China.

The full length of the extension line between Beijing and Tianjin is 44.815 kilometers, for the only one TBM tunnel with 2.8 kilometers; the Φ11.97m bentonite slurry balance TBM with air cushion type from our company is used in the part of 2.25 kilometers. The installed total power of the equipment is 3960kw. The length of main body is 50 meters and the weight is 1300 tons.

It creates another successful achievement after that NHIs TBM is used in the national projects of high-speed rail SHIZIYANG tunnel between Guangzhou and Shenzhen, Wuhan river tunnel as the first tunnel of Yangtze River, the railway underground line for Beijing and Tianjin in China. 

临西县| 沧源| 武功县| 潞西市| 城步| 乐昌市| 陆河县| 孙吴县| 水城县| 阳信县| 建湖县| 湾仔区| 开封市| 吉首市| 含山县| 卓尼县| 灌云县| 沙坪坝区| 车险| 平定县| 长丰县| 株洲县| 柞水县| 阳西县| 沐川县| 苍溪县| 昂仁县| 南漳县| 台江县| 方城县| 嘉峪关市| 岑溪市| 保康县| 聂拉木县| 五指山市| 高州市| 西藏| 都兰县| 大港区| 河北省| 保定市|